Sim2 Multimedia HT300 Link Installation, Package Contents, Positioning The Two Units

Models: HT300 Link

1 39
Download 39 pages 27.48 Kb
Page 9
Image 9
PACKAGE CONTENTS

PACKAGE CONTENTS

Projector

Instruction

Manual

Three-core fibre optic cable

DIGIOPTIC ™

IMAGE

 

 

PROCESSOR

 

 

 

 

ON

DigiOptic™

 

OFF

 

 

Image Processor

 

 

DigiOptic™ Image Processor power supply unit

Support

Remote Control

The carton should contain the following:

-

the projector

- the DigiOptic™ Image Processor

-

the remote control

- four 1.5V AAA batteries (for remote control)

- DigiOptic™ Image Processor power supply unit

- three power cables for the projector (EU, UK, USA)

- three power cables for the DigiOptic™ Image Processor

 

(EU, UK, USA)

- triple fiber optic cable for linking DigiOptic™ Image

 

Processor and the projector

Cable HDMI™-DVI

1.5 V AAA- type batteries

Power cables

Cable HDMI™-HDMI™

Europe, UK, US (x2)

Fig.5

- one cable HDMI™-HDMI™

- one cable HDMI™-DVI

-

two brackets for mounting the DigiOptic™ Image

 

Processor to the rack.

-

the user and installation manual.

If any accessories are missing, contact your Dealer as soon as possible.

4 INSTALLATION

POSITIONING THE TWO UNITS

The HT300 LINK system consists of two separate units (the DigiOptic™ Image Processor and the Projector), each of which is equipped with a power cable; the two units are interconnected by a 20 m fibre optic cable.

The ideal location for the DigiOptic™ Image Processor is on a cabinet shelf or on a rack (dimensions compatible with a stan- dard 19" rack). Make sure that the support surface is stable and that the unit has sufficient space around it for ventilation purposes (at least 3 cm).

The unit is connected to the mains via an external power supply unit with an output of +7 Vdc; the unit’s main power switch is on the power supply unit.

Connect the power supply unit output cable to the POWER socket located on the rear panel (Fig. 2).

Use exclusively the power supply unit provided with the system or an alternative power supply unit expressly approved by SIM2.

To mount the DigiOptic Image Processor on an equipment rack use the screws and RH / LH supports supplied with the appliance. Unscrew the screws that secure the cover to the DigiOptic unit base, position the RH and LH supports and fix into place with the supplied screws. To secure the unit to the rack use the supplied screws (Fig.6).

DIG

IOP

 

TIC“

 

IM

 

AG

 

E P

 

ROC

 

ESSOR

 

ON

 

OFF

Fig.6

Position the projector on a stable, suitable platform or utilise the optional bracket for a fixed ceiling or wall installation.

7

Page 9
Image 9
Sim2 Multimedia HT300 Link installation manual Installation, Package Contents, Positioning The Two Units