Manuals
/
Slant/Fin
/
Household Appliance
/
Boiler
Slant/Fin
VHS-180, VHS-30 VICTORY II VHS Models, Figure . Piping Arrangement
Models:
VHS-180
VHS-30
1
17
27
27
Download
27 pages
46.44 Kb
14
15
16
17
18
19
20
21
<
>
Troubleshooting
Install
If Replacement Parts Are Needed
Dimension
Maintenance
Electrical Wiring
Burner Adjustment
Annual Inspection and Cleaning
Safety
Vent Connector Material
Page 17
Image 17
V
ICTORY
II
VHS Models
Figure 14.
Figure 15. Piping Arrangement
17
Page 16
Page 18
Page 17
Image 17
Page 16
Page 18
Contents
HOT WATER MODELS VHS-30THROUGH VHS-180
INSTALLATION AND OPERATING INSTRUCTIONS
VICTORY
VICTORY II VHS Models
Figure 1. Views - Dimensions - Data
Figure 2. Base Assembly Victory II - VHS Boiler
SAFETY
INSTALLATION REQUIREMENTS
VICTORY II VHS Models
NATURAL GAS-FIREDBOILER LOCATION
VICTORY II VHS Models
Consult vent manufacturer’s instructions
VICTORY II VHS Models
Figure 4. Vent Sealing Instructions
Flex-L StaR-34and Z-Flex Z-VentSystem
Heat-Fab Saf-TVent System
ProTech FasNSeal System
VICTORY II HORIZONTAL SIDEWALL VENTING
VICTORY II VHS Models
VICTORY II VHS Models
2.Vent Connector Material
Type “B” Venting 1. Installation
VICTORY II VHS Models
CATEGORY I VENTING Natural Draft Chimney and
Natural Draft Chimney and Type “B” Venting Tables
VICTORY II VHS Models
VICTORY II VHS Models
1.Power Supply
ELECTRICAL WIRING
2.Power Connection
3.Thermostat Connections
Figure 11a
VICTORY II VHS Models
WATER PIPING
1. Supply and Return
VICTORY II VHS Models
Figure Figure 15. Piping Arrangement
VICTORY II VHS Models
VICTORY II VHS Models
For Your Safety Read Before Operating
SAFETY INFORMATION
3.Burner Adjustment
VICTORY II VHS Models
Gas Rate Table
SAFETY CHECK
VICTORY II VHS Models
3.Air Flow Pressure Switch Test
2.Gas Control Safety Shutdown Test
CARE AND MAINTENANCE
1.General Maintenance
2.Inspection During Heating Season
3.Annual Inspection and Cleaning
VICTORY II VHS Models
Victory II Boiler Sequence of Operations
General Troubleshooting Guide For Servicepeople
IF REPLACEMENT PARTS ARE NEEDED
Drain Requirements
APPENDIX A Vent System Location and Condensation
APPENDIX B Removal of Existing Boiler From
Common Vent System