Slant/Fin VHS-30, VHS-180 Heat-Fab Saf-TVent System, ProTech FasNSeal System

Models: VHS-180 VHS-30

1 27
Download 27 pages 46.44 Kb
Page 6
Image 6
Heat-Fab Saf-T Vent System

VICTORY II VHS Models

Heat-Fab Saf-T Vent System

 

Max. Equivalent Length (Ft.)

 

 

 

 

 

 

Equivalent

 

 

 

 

 

 

 

0 to

5500 to

7000 to

Length of

 

Boiler

5500 Ft.

7000 Ft.

10,000 Ft.

each 90°

Minimum

Model No.

Altitudes

Altitudes

Altitudes

Elbow, Ft.

Length, Ft.

 

 

 

 

 

 

VHS-30,

40

40

40

3

2

60, 90

 

 

 

 

 

and 120

 

 

 

 

 

 

 

 

 

 

 

VHS-150

40

40

20

3

2

 

 

 

 

 

 

VHS-180

40

20

20

3

2

 

 

 

 

 

 

ProTech FasNSeal System

 

Max. Equivalent Length (Ft.)

 

 

 

 

 

 

Equivalent

 

 

 

 

 

 

 

0 to

5500 to

7000 to

Length of

 

Boiler

5500 Ft.

7000 Ft.

10,000 Ft.

each 90°

Minimum

Model No.

Altitudes

Altitudes

Altitudes

Elbow, Ft.

Length, Ft.

 

 

 

 

 

 

VHS-30,

30

30

30

6

2

60, 90

 

 

 

 

 

and 120

 

 

 

 

 

 

 

 

 

 

 

VHS-150

30

30

15

6

2

 

 

 

 

 

 

VHS-180

30

15

15

6

2

 

 

 

 

 

 

Flex-L StaR-34 and Z-Flex Z-Vent System

 

Max. Equivalent Length (Ft.)

 

 

 

 

 

 

Equivalent

 

 

 

 

 

 

 

0 to

5500 to

7000 to

Length of

 

Boiler

5500 Ft.

7000 Ft.

10,000 Ft.

each 90°

Minimum

Model No.

Altitudes

Altitudes

Altitudes

Elbow, Ft.

Length, Ft.

 

 

 

 

 

 

VHS-30,

35

35

35

6

2

60, 90

 

 

 

 

 

and 120

 

 

 

 

 

 

 

 

 

 

 

VHS-150

35

35

18

6

2

 

 

 

 

 

 

VHS-180

35

18

18

6

2

 

 

 

 

 

 

Note: Vent termination is in addition to the allowed equivalent length.

6

Page 6
Image 6
Slant/Fin VHS-30, VHS-180 Heat-Fab Saf-TVent System, ProTech FasNSeal System, Flex-L StaR-34and Z-Flex Z-VentSystem