Manuals
/
Slant/Fin
/
Household Appliance
/
Boiler
Slant/Fin
VHS-30, VHS-180 installation instructions VICTORY II VHS Models
Models:
VHS-180
VHS-30
1
8
27
27
Download
27 pages
46.44 Kb
5
6
7
8
9
10
11
12
<
>
Troubleshooting
Install
If Replacement Parts Are Needed
Dimension
Maintenance
Electrical Wiring
Burner Adjustment
Annual Inspection and Cleaning
Safety
Vent Connector Material
Page 8
Image 8
V
ICTORY
II
VHS Models
Figure 7.
8
Page 7
Page 9
Page 8
Image 8
Page 7
Page 9
Contents
HOT WATER MODELS VHS-30THROUGH VHS-180
INSTALLATION AND OPERATING INSTRUCTIONS
VICTORY
VICTORY II VHS Models
Figure 1. Views - Dimensions - Data
Figure 2. Base Assembly Victory II - VHS Boiler
INSTALLATION REQUIREMENTS
SAFETY
VICTORY II VHS Models
NATURAL GAS-FIREDBOILER LOCATION
VICTORY II VHS Models
Consult vent manufacturer’s instructions
VICTORY II VHS Models
Figure 4. Vent Sealing Instructions
Flex-L StaR-34and Z-Flex Z-VentSystem
Heat-Fab Saf-TVent System
ProTech FasNSeal System
VICTORY II HORIZONTAL SIDEWALL VENTING
VICTORY II VHS Models
VICTORY II VHS Models
Type “B” Venting 1. Installation
2.Vent Connector Material
VICTORY II VHS Models
CATEGORY I VENTING Natural Draft Chimney and
Natural Draft Chimney and Type “B” Venting Tables
VICTORY II VHS Models
VICTORY II VHS Models
ELECTRICAL WIRING
1.Power Supply
2.Power Connection
3.Thermostat Connections
VICTORY II VHS Models
Figure 11a
WATER PIPING
1. Supply and Return
VICTORY II VHS Models
VICTORY II VHS Models
Figure Figure 15. Piping Arrangement
VICTORY II VHS Models
SAFETY INFORMATION
For Your Safety Read Before Operating
3.Burner Adjustment
VICTORY II VHS Models
Gas Rate Table
SAFETY CHECK
VICTORY II VHS Models
2.Gas Control Safety Shutdown Test
3.Air Flow Pressure Switch Test
CARE AND MAINTENANCE
1.General Maintenance
2.Inspection During Heating Season
3.Annual Inspection and Cleaning
VICTORY II VHS Models
Victory II Boiler Sequence of Operations
General Troubleshooting Guide For Servicepeople
IF REPLACEMENT PARTS ARE NEEDED
APPENDIX A Vent System Location and Condensation
Drain Requirements
APPENDIX B Removal of Existing Boiler From
Common Vent System