Slant/Fin VHS-180, VHS-30 installation instructions Victory II Boiler Sequence of Operations

Models: VHS-180 VHS-30

1 27
Download 27 pages 46.44 Kb
Page 23
Image 23
Victory II Boiler Sequence of Operations

VICTORY II VHS Models

Victory II Boiler Sequence of Operations

THERMOSTAT CALLS FOR HEAT

 

 

 

 

CIRCULATOR ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NO

BOILER WATER TEMPERATURE

 

IS BELOW HIGH LIMIT SETTING?

 

 

 

 

 

 

 

 

 

 

 

 

YES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INDUCER (AIR BLOWER) ON

 

 

 

 

 

 

 

AIR PROVING SWITCH

NO

PROVED CLOSED?

 

 

 

YES

 

 

 

 

 

IGNITION SPARK STARTS AND PILOT

VALVE OPERATOR OPENS

CIRCULATOR

CONTINUES TO

RUN

PROPANE GAS-S8600H

IGNITION SPARK CON- TINUES FOR APPROXI- MATELY 90 SECONDS. IF PILOT FLAME NOT ESTABLISHED, SYSTEM LOCKS OUT; SYSTEM MUST BE MANUALLY RESET.

NO

PILOT FLAME ESTABLISHED?

NO

 

 

 

 

 

 

 

 

 

 

 

 

YES

 

 

 

 

 

 

 

SPARK GENERATOR OFF.

MAIN VALVE OPENS. MODULE

MONITORS PILOT FLAME

THERMOSTAT CALLS FOR

HEAT ENDS

CIRCULATOR OFF.

PILOT AND MAIN VALVE CLOSE.

INDUCER OFF

WAIT FOR NEXT CALL FOR HEAT

NATURAL GAS-S8600F

IGNITION SPARK CONTINUES. PILOT VALVE REMAINS OPEN UNTIL SYSTEM IS RESET.

23

Page 23
Image 23
Slant/Fin VHS-180, VHS-30 installation instructions Victory II Boiler Sequence of Operations