AOC-09 Reliability Monitoring Programs
18. | Are statistical techniques used in | N/A | OK | Finding | Not Checked |
| reliability measurement supportive |
|
|
|
|
| of maintenance control actions ? |
|
|
|
|
| ∙ Are actuarial or engineering |
|
|
|
|
| studies used to determine |
|
|
|
|
| maintenance changes. |
|
|
|
|
| ∙ Are studies made involving |
|
|
|
|
| inspection frequency and |
|
|
|
|
| content, overhaul limits and |
|
|
|
|
| times ? |
|
|
|
|
| ∙ Do they show aircraft, system, |
|
|
|
|
| or component modification ? |
|
|
|
|
| ∙ Does it show other actions |
|
|
|
|
| peculiar to prevailing |
|
|
|
|
| conditions ? |
|
|
|
|
|
|
|
|
|
|
19. | Are there provisions for the re- | N/A | OK | Finding | Not Checked |
| evaluating performance standards |
|
|
|
|
| that lose their value ? |
|
|
|
|
|
|
|
|
|
|
20. | Are there provisions to establish | N/A | OK | Finding | Not Checked |
| initial performance standards for |
|
|
|
|
| new aircraft being placed in |
|
|
|
|
| service ? |
|
|
|
|
|
|
|
|
|
|
21. | Are there provisions for the initial | N/A | OK | Finding | Not Checked |
| alert values to be adjusted based |
|
|
|
|
| on carrier’s first year of |
|
|
|
|
| experience ? |
|
|
|
|
|
|
|
|
|
|
22. | If PIREPS per 1000 departures is | N/A | OK | Finding | Not Checked |
| the standard, is 5 PIREPS per |
|
|
|
|
| 1000 added to rate for past year to |
|
|
|
|
| set alert value? |
|
|
|
|
|
|
|
|
|
|
23. | Are alert levels set up on a | N/A | OK | Finding | Not Checked |
| combination of past performance |
|
|
|
|
|
|
|
|
|
|
| March 2001 |
|
|
| Page 41 |