AOC-08 Maintenance Development Program (MPD)

37.

Are the duties and responsibilities

N/A

OK

Finding

Not Checked

 

for initiating program revision

 

 

 

 

 

clearly defined?

 

 

 

 

 

 

 

 

 

 

38.

Does the operator use trending as

N/A

OK

Finding

Not Checked

 

a means for determining

 

 

 

 

 

maintenance requirements?

 

 

 

 

 

 

 

 

 

 

39.

Is the documentation required to

N/A

OK

Finding

Not Checked

 

be used to effect changes in

 

 

 

 

 

maintenance program described?

 

 

 

 

 

 

 

 

 

 

40.

Procedures provided to assure that

N/A

OK

Finding

Not Checked

 

any TBO adjustment or other

 

 

 

 

 

program change does not conflict

 

 

 

 

 

with a corrective action program

 

 

 

 

 

established by a previous reliability

 

 

 

 

 

analysis.

 

 

 

 

 

 

 

 

 

 

41.

Program contains a statement that

N/A

OK

Finding

Not Checked

 

the TC Office will be advised when

 

 

 

 

 

increases to time limitations or

 

 

 

 

 

other program changes controlled

 

 

 

 

 

by the program occur.

 

 

 

 

 

 

 

 

 

 

42.

Does the program include a

N/A

OK

Finding

Not Checked

 

graphic display of major

 

 

 

 

 

system/component TBO

 

 

 

 

 

escalation.

 

 

 

 

 

 

 

 

 

 

Maintenance Schedule Amendment:

March 2001

Page 35

Page 35
Image 35
Sonic Alert 705, 704 manual Maintenance Schedule Amendment