For Machines Mfg. Since 8/09

P R E P A R A T I O N

Model SB1023

PreparationREPARATIONOverview

The purpose of the preparation section is to help you prepare your machine for operation.

The typical preparation process is as follows:

1.Unpack the machine and inventory the contents of the box/crate.

2.Clean the machine and its components.

3.Identify an acceptable location for the machine and move it to that location.

4.Level the machine and either bolt it to the floor or place it on mounts.

5.Assemble the loose components and make any necessary adjustments or inspections to ensure the machine is ready for operation.

6.Connect the machine to the power source.

7.Test run the machine to make sure it functions properly and is ready for operation.

Things You'll Need

During the setup process, operation, and maintenance of your machine, you'll need the following items:

For Lifting

A forklift or other power lifting device rated for the weight of the machine.

Lifting Strap or Chain (rated for at least 1500 lbs.)

For Power Connection

A machine power connection that meets federal, state, and local electrical codes. An electrician may be required.

For Assembly

Assistant

Cotton Rags

Mineral Spirits

Safety Glasses

Wrench 14mm

Wrench 19mm

Oil Can with any General Machine Oil