SPX Cooling Technologies FSIG-TS-08A specifications Plan, Section B, Section P

Models: FSIG-TS-08A

1 30
Download 30 pages 19.14 Kb
Page 6
Image 6
Plan

Marley / Sigma F Series CoolingTower / Engineering Data : Support

6

 

 

6" MIN

 

A SPACES AT 4'-0" = L

 

OPTIONAL PARTITION WALL

 

 

TYP

 

B AIR INLET FACE

FOR INDIVIDUAL CELL OPERATION

 

 

 

INTO IN OF CURBWALLS

CASED ENDWALLFACE

P

CASED ENDWALLFACE

W

 

 

 

B

AIR INLET FACE

 

 

SUMP

 

 

SEE NOTE 7

TOP OF BASIN CURB

 

 

 

 

 

Plan

TOP OF PARTITION WALL

 

 

1'-6"

TOP OF BASIN CURB

1'-0"

1'-4"

1'-6"

 

 

 

 

 

 

 

OPERATING WATER

LEVEL RECOMMENDED Section B

6" MIN

Section B

 

 

 

 

 

Section P

 

 

 

 

 

 

 

 

Tower

 

 

Dimensions

 

Operating Weight lb

Model

 

 

 

 

 

 

 

 

A

W

L

Single Fan Cell

Each Cell Add

Note 4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F1211

 

4

26'-4"

16'-0"

39220

35920

 

 

 

 

 

 

 

 

 

F1221

 

4

28'-4"

16'-0"

41460

38160

 

 

 

 

 

 

 

 

 

F1231

 

5

28'-4"

20'-0"

48200

44860

 

 

 

 

 

 

 

 

 

F1241

 

6

28'-4"

24'-0"

55300

51980

 

 

 

 

 

 

 

 

 

F1251

 

6

32'-4"

24'-0"

61260

57880

 

 

 

 

 

 

 

 

 

F1261

 

7

32'-4"

28'-0"

68280

64800

 

 

 

 

 

 

 

 

 

NOTE

1Use this bulletin for preliminary layouts only. Do not use for construction. Obtain current drawings from your Marley representative.

2Tower weight is total wet operating weight of tower only ex- cluding water in the concrete basin.

3Purchaser to design, construct and furnish concrete basin complete to suit the general dimensions of current Marley drawings.

4Last number of model indicates number of cells. Change as ap- propriate for your selection. Primary engineering data is per cell.

5All anchor bolts complete with nut and washer will be furnished by others. Bolts are 34" diameter with 112" all thread projection. Material should be stainless steel.

6Maintain no less than 2'-0" of clear space at tower endwalls for construction purposes. Louvered faces must have unobstruct- ed air supply. If obstructions exist nearby, consult your Marley representative.

7Purchaser must design, construct, and furnish sump(s) and overflow(s) to suit requirements. The sump should be designed according to the pump manufacturer's recommendations.

Page 6
Image 6
SPX Cooling Technologies FSIG-TS-08A specifications Plan, Section B, Section P