Manuals
/
State Industries
/
Household Appliance
/
Water Heater
State Industries
SUF-130- 300/400/500
instruction manual
Models:
SUF-130- 300/400/500
1
75
76
76
Download
76 pages
49.62 Kb
69
70
71
72
73
74
75
76
Troubleshooting
Install
Water Piping Diagrams
Fault And Alert Conditions
Electrical Wiring
Warranty
Dimension
Maintenance
Operational Problems
Drain Valve and Access Panels
Page 75
Image 75
75
Page 74
Page 76
Page 75
Image 75
Page 74
Page 76
Contents
Commercial gas water heaters
Table Of Contents
Safe Installation, Use and Service
ANSI/NSF-5
Optional
Overheated water can cause water tank explosion
General Safety Information
Precautions
Hydrogen Gas Flammable
Fire and Explosion Hazard
Installing, using or servicing Water heater
Qualifications
Preparing For The Installation
Introduction
Abbreviations Used
Basic Operation
Features And Components
Water Heater’s 120 VAC on/off switch
Top View
Top View Components
Side Views
Gas Line Connection Size
Installation Considerations
Rough In Dimensions
Recovery Capacities
Intake Air and Vent Pipe Clearances
Service Clearance
Locating The Water Heater
Clearance To Combustible Materials
Circulation Pumps
Extended Vent Terminations
Optional Concentric Terminations
Hard Water
Supply Gas Line
Installation Requirements
Power Supply
Gas Pressure Requirements
Thermal Expansion
Mixing Valves
Dishwashing Machines
Closed Water Systems
Valve Discharge Pipe Requirements
Temperature-Pressure Relief Valve
Condensate Drain Water Trap
Condensate Drain
Combustible Material Storage
Contaminated Air
Air Requirements
Unconfined Space
Confined Space
Outdoor Air Through Two Horizontal Ducts
Fresh Air Openings For Confined Spaces
Outdoor Air Through Two Openings
Outdoor Air Through One Opening
Page
Inspection
Commonwealth of Massachusetts
Venting Installation
General Venting Information
General Venting Instructions
Venting Requirements
Venting Installation Sequence
Power Vent Installation
Direct Vent Installation
3 Reducer
Vertical Termination Installation
Vertical Termination Direct Vent
Sidewall Termination Installation
Inch Concentric Termination Flat Roof Clearance
Concentric Termination Installation
Inch Concentric Termination KIT
Inch Concentric Termination Installation
Inch Concentric Termination Sidewall Installation
Eight Concentric Terminations
TWO Concentric Terminations
Three Concentric Terminations
Four Concentric Terminations
Multiple Concentric Termination Arrangements
Two Concentric Terminations
Eight Concentric Terminations
Power Vent Horizontal
Venting Arrangements
Direct Vent Horizontal
Direct Vent Vertical Vent Horizontal Intake
Direct Vent Horizontal Vent Vertical Intake
Direct Vent Horizontal Concentric
Power Vent
Termination Clearances Sidewall Power Vent
Direct Vent
Termination Clearances Sidewall Direct Vent
Installation Instructions
Water Heater Installation
Condensate Drain Installation
Installation Notes
Supply Gas Line Sizing Metric Units
Supply Gas Line Installation
Gas Line Sizing
Supply Gas Line Sizing U. S. Units
Supply Gas Regulator Installation
Gas Line Leak Testing
Gas Line Connection
Connecting An External Supervisory Control
Electrical Wiring
Power Supply Connections
Enable/Disable Circuit
Thermometers not Supplied
Water Piping Diagrams
Water Line Connections
Valve Discharge Pipe
Thermostat Control
Temperature Regulation
High Temperature Limit Control ECO
High Temperature Applications
User Input Buttons
Control System Operation
Overview
Control System Navigation
Icon Description
Status Icons
Menu Description
Operating States
State Description
Control System Menus
Description/Action Display
User Settings & Control System Menus
Update Cancel
Back Help
Change Back Help
Heater Information Description/Action Display
Display Settings Description/Action
YES
Back Advanced
View Back Help
ECO
Name
Update
Service Contact Information
Select Back Help
Start Up
Prior to Start up
Initial Start Up
Supply Gas Pressure Adjustment
Multiple Appliance Installations
Manifold Gas Pressure Adjustment
To Turn Off Gas
High Altitude Installations
Checking The Firing Rate
1050 = 300,000 Btu/hr 87.9 kW
Lighting The Water Heater
Lighting & Operation Label
Honeywell
Troubleshooting
Installation Checklist
Sequence Of Operation
Water is heated to VAC Gas Valve
Sequence Of Operation Flow Chart
Closed by control system Fault Msg is displayed
Pre-Purge cycle
Momentary Ignition
Operational Problems
Installation Errors
Rough Starting, Rough Operation
Fault And Alert Conditions
Possible Causes Check/Repair Displayed Fault/Alert Message
Fault And Alert Messages
No Anode Voltage
Blower Prover Failure
Draining And Flushing
Maintenance
Maintenance Schedule
General
Filling The Water Heater
Sediment Removal
Lime Scale Removal
Vent System
Powered Anode Rods
Drain Valve and Access Panels
Temperature-Pressure Relief Valve Test
CCB Central Control Board Layout
Diagrams
User Interface Modul
SUF 130 300 Wiring Diagram
User
SUF 130 400, 500 Wiring Diagram
Circulation Pump Wiring Diagrams
Water Piping Diagrams
Temperature & Pressure
Tank Temperature ALT. Cold Water
State Storage Tank
Water Piping Diagrams
Line Temperature Control
HOT Water Outlet Pipe T&P to Open Drain Finished Floor
Limited Warranty
Top
Page
Image
Contents