Water Heater Installation
Condensate Drain Installation
Installation must conform with these instructions and local building codes.
Condensate neutralizer kits are available. Contact your distributor or Service Agency.
Field supplied materials required for installation include:
•Approved PVC cement and PVC primer.
•1/2 inch PVC pipe - minimum length to equal the distance between the water heater and a suitable building drain.
•1/2 inch PVC fittings (elbows and couplings) necessary to install a condensate drain line between the Condensate Drain Trap Assembly and a suitable building drain.
•Floor mounted standoffs to brace the drain line.
Installation Notes
1.The condensate drains from the water heater’s covered by this instruction have PH levels between 4.3 and 5.0. Install a commercially available neutralizing kit if required by local codes. Lower PH levels are acidic. Do not connect a metal condensate drain line, such as copper pipe, to the water heater for this reason.
2.The field installed condensate drain line must not be less
than 1/2 inch PVC in size.
3.Do not remove, modify or alter the factory condensate trap.
Installation Instructions
1.Ensure the water heater’s on/off switch is in the “off” position.
2.Install a 1/2 inch PVC condensate drain line between the condensate drain connection on the Condensate Drain Trap and a suitable building drain, see Figure 50 and Figure 51.
3.Terminate the condensate drain piping with an elbow above the drain. Ensure that any discharge will exit the condensate drain line no more than 6 inches (15.2 cm) above a suitable building drain, or external to the building, see Figure 50.
Note: In cold climates it is recommended the condensate drain be terminated at a suitable drain inside the building.
4.Ensure the condensate drain line is not elevated above the condensate drain connection on the trap, see Figure 51.
5.Brace the condensate drain line with floor mounted standoffs every three feet.
6.Ensure the condensate drains freely during start up, see Start Up on page 36.
EXHAUST (VENT) ELBOW
| CONDENSATE DRAIN |
| LINE - FIELD INSTALLED |
CLEANOUT PLUG SHOULD | DRAIN LINE TO |
FACE TOWARDS THE FRONT | |
OF THE WATER HEATER FOR | TERMINATE NO |
SERVICE ACCESS | MORE THAN 6 |
| INCHES (15.2 cm) |
| ABOVE DRAIN |
FACTORY INSTALLED | BUILDING |
CONDENSATE TRAP | DRAIN |
Figure 50
PVC PIPE NIPPLE | PVC BUSHING |
½” NPT | 1 ½” SLIP x ½” SLIP |
PVC TEE FITTING
1 ½” SLIP x 1 ½” SLIP x ½” NPT
PVC BUSHING
1 ½” SLIP x 1 ¼” NPT
PVC PIPE PLUG 1 ¼” NPT
CLEANOUT PIPE
PLUG SHOULD
BE ORIENTED TO THE FRONT OF THE WATER HEATER FOR SERVICE ACCESS
½” PVC 90° ELBOW CONDENSATE DRAIN CONNECTION. FIELD INSTALLED DRAIN LINE CONNECTS HERE
½” PVC PIPE NIPPLE
½” PVC 90°
STREET ELBOW
CONDENSATE TRAP DETAIL
Figure 51
36