State Industries SUF-130- 300/400/500 Extended Vent Terminations, Hard Water, Circulation Pumps

Models: SUF-130- 300/400/500

1 76
Download 76 pages 49.62 Kb
Page 12
Image 12

Extended Vent Terminations

The water heaters covered by this manual can be installed using 4 inch pipe for the intake air and/or vent piping up to a maximum of 70 equivalent feet (21.3 m). The intake air and/or vent piping can be extended up to 120 equivalent feet (36.5 m) by installing 6 inch pipe. See the Venting Requirements on page 12.

The water heater ships from the factory with two (2) 4 inch terminations that are 45° PVC elbows with a debris screen installed. When 6 inch intake air or vent pipe is installed, factory supplied 6 inch terminations must be used.

Contact your local distributor or call the parts department phone number listed on the back cover of this manual to order 6 inch termination(s).

Optional Concentric Terminations

The water heaters covered by this manual can be installed in a Direct Vent configuration using optional concentric terminations.

SUF 130 300 models installed using 4 inch vent/intake air piping use the 4 inch concentric termination. SUF 130 300 models installed using 6 inch vent/intake air piping use the 6 inch concentric termination. SUF 130 400 and 500 models must use the 6 inch concentric termination on all installations. See the Venting Requirements on page 12 and Concentric Termination Installation on page 12.

Concentric terminations must be ordered separately. Contact your local distributor or call the parts department phone number listed on the back cover of this manual to order.

4” Concentric Termination Part # 9006328005

6” Concentric Termination Part # 9006144005

Hard Water

Where hard water conditions exist, water softening or the threshold type of water treatment is recommended. This will protect the dishwashers, coffee urns, water heaters, water piping and other equipment.

See Maintenance on page 12 for sediment and lime scale removal procedures.

Circulation Pumps

A circulating pump is used when a system requires a circulating loop or there is a storage tank used in conjunction with the water heater. See the Water Piping Diagrams beginning on page 12 for installation location of circulating pumps.

See Circulation Pump Wiring Diagrams on page 12 for electrical hookup information. Install in accordance with the current edition of the National Electrical Code, NFPA 70 or the Canadian Electrical Code, CSA C22.1.

All-bronze circulators are recommended for used with commercial water heaters.

Some circulating pumps are manufactured with sealed bearings and do not require further lubrication. Some circulating pumps must be periodically oiled. Refer to the pump manufacturer’s instructions for lubrication requirements.

insulation blankets

Breathing Hazard - Carbon Monoxide Gas

Do not obstruct water heater air intake with insulating blanket.

Gas and carbon monoxide detectors are available.

Install water heater in accordance with the instruction manual.

Breathing carbon monoxide can cause brain damage or death. Always read and understand instruction manual.

Insulation blankets are available to the general public for external use on gas water heaters but are not necessary with these products. The purpose of an insulation blanket is to reduce the standby heat loss encountered with storage tank heaters. The water heaters covered by this manual meet or exceed the Energy Policy Act standards with respect to insulation and standby heat loss requirements, making an insulation blanket unnecessary.

Should you choose to apply an insulation blanket to this heater, you should follow these instructions. See the Features and Components section of this manual for identification of components mentioned below. Failure to follow these instructions can restrict the air flow required for proper combustion, potentially resulting in fire, asphyxiation, serious personal injury or death.

Do not apply insulation to the top of the water heater, as this will interfere with safe operation of the blower assembly.

Do not cover the control system LCD on top of the water heater.

Do not cover the Temperature-Pressure Relief Valve.

Do not cover the instruction manual. Keep it on the side of the water heater or nearby for future reference.

Do obtain new warning and instruction labels from the manufacturer for placement on the blanket directly over the existing labels.

Do inspect the insulation blanket frequently to make certain it does not sag, thereby obstructing combustion air flow.

12

Page 12
Image 12
State Industries SUF-130- 300/400/500 Extended Vent Terminations, Optional Concentric Terminations, Hard Water