Chapter 6: Maintenance
6-1 Maintenance Schedule
The checklist below contains a list of items that should be inspected and/or replaced to keep your Large Dehumidifying Dryer operating at peak efficiency. Perform each inspection at the regular intervals listed below.
Dryer Model #
Serial #
EVERY WEEK | Date/ | Date/ | Date/ | Date/ | Date/ | Date/ | Date/ | Date/ | Date/ | Date/ | Date/ | Date/ | Date/ |
| By | By | By | By | By | By | By | By | By | By | By | By | By |
Inspect all filters for wear, replace/clean if dirty or worn
EVERY MONTH | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
Lock out electrical power |
|
|
|
|
|
|
|
|
|
|
|
|
|
and inspect electrical |
|
|
|
|
|
|
|
|
|
|
|
|
|
wiring for integrity |
|
|
|
|
|
|
|
|
|
|
|
|
|
Lock out electrical power |
|
|
|
|
|
|
|
|
|
|
|
|
|
and check heater |
|
|
|
|
|
|
|
|
|
|
|
|
|
elements for continuity |
|
|
|
|
|
|
|
|
|
|
|
|
|
using an ohmmeter |
|
|
|
|
|
|
|
|
|
|
|
|
|
Check Dew point and |
|
|
|
|
|
|
|
|
|
|
|
|
|
temperature tracking with |
|
|
|
|
|
|
|
|
|
|
|
|
|
an external dew point |
|
|
|
|
|
|
|
|
|
|
|
|
|
monitor and pyrometer |
|
|
|
|
|
|
|
|
|
|
|
|
|
Visually inspect the |
|
|
|
|
|
|
|
|
|
|
|
|
|
shifting of the airflow |
|
|
|
|
|
|
|
|
|
|
|
|
|
valve during one cycle |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||||
EVERY YEAR | Next Scheduled | Actual Inspection |
| Next Scheduled | Actual Inspection | ||||||||
| Inspection |
| Date/By |
| Inspection |
| Date/By | ||||||
Inspect desiccant. Replace |
|
|
|
|
|
|
|
|
|
|
|
|
|
if brown or broken |
|
|
|
|
|
|
|
|
|
|
|
|
|
- Photocopy this page for your maintenance records -
Large Dehumidifying Dryers | Maintenance | 56 |