Chapter 6: Maintenance

6-1 Maintenance Schedule

The checklist below contains a list of items that should be inspected and/or replaced to keep your Large Dehumidifying Dryer operating at peak efficiency. Perform each inspection at the regular intervals listed below.

Dryer Model #

Serial #

EVERY WEEK

Date/

Date/

Date/

Date/

Date/

Date/

Date/

Date/

Date/

Date/

Date/

Date/

Date/

 

By

By

By

By

By

By

By

By

By

By

By

By

By

Inspect all filters for wear, replace/clean if dirty or worn

EVERY MONTH

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Lock out electrical power

 

 

 

 

 

 

 

 

 

 

 

 

 

and inspect electrical

 

 

 

 

 

 

 

 

 

 

 

 

 

wiring for integrity

 

 

 

 

 

 

 

 

 

 

 

 

 

Lock out electrical power

 

 

 

 

 

 

 

 

 

 

 

 

 

and check heater

 

 

 

 

 

 

 

 

 

 

 

 

 

elements for continuity

 

 

 

 

 

 

 

 

 

 

 

 

 

using an ohmmeter

 

 

 

 

 

 

 

 

 

 

 

 

 

Check Dew point and

 

 

 

 

 

 

 

 

 

 

 

 

 

temperature tracking with

 

 

 

 

 

 

 

 

 

 

 

 

 

an external dew point

 

 

 

 

 

 

 

 

 

 

 

 

 

monitor and pyrometer

 

 

 

 

 

 

 

 

 

 

 

 

 

Visually inspect the

 

 

 

 

 

 

 

 

 

 

 

 

 

shifting of the airflow

 

 

 

 

 

 

 

 

 

 

 

 

 

valve during one cycle

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EVERY YEAR

Next Scheduled

Actual Inspection

 

Next Scheduled

Actual Inspection

 

Inspection

 

Date/By

 

Inspection

 

Date/By

Inspect desiccant. Replace

 

 

 

 

 

 

 

 

 

 

 

 

 

if brown or broken

 

 

 

 

 

 

 

 

 

 

 

 

 

- Photocopy this page for your maintenance records -

Large Dehumidifying Dryers

Maintenance

56

Page 56
Image 56
Sterling SDA AP-1 specifications Maintenance Schedule, Photocopy this page for your maintenance records