XSV-05, XSV-05/R, & XSV-05/2R Single Conveying Units - Venturi Style 22 of 36
5-1 Maintenance Intervals
Check the setting of the pressure regulator.
Empty the water separator.
Daily:
Check danger signs on the unit for legibility and completeness.
Clean the cartridge filter and screen (depending on accumulation of
dust).
Blow out the filter from the inside using compressed air.
Monthly:
Check the electrical connections for proper functioning.
Check all electrical and mechanical connections for proper fit.
Every 6
months: Replace filter and screen (depending on accumulation of dust).
Disconnect the equipment from main electrical supply before
starting maintenance procedures to ensure that it cannot be
switched on unintentionally. Depressurize all compressed air
piping of the equipment before starting maintenance work.
Please observe the maintenance intervals.
Before starting maintenance work, clean the equipment of oil, fuel
or lubricants.
Ensure that materials and incidentals required for operation as well
as spare parts are disposed of properly and in an environmentally
sound manner.
Use only original manufacturer spare parts.
Keep record of all maintenance and repair procedures.
The maintenance intervals provided are average values.
The maintenance intervals might be shortened due to your
individual process conditions.