2-3 Installing the Control and Maintenance Unit

Install the control and maintenance unit at a freely accessible site. Check the length of the connection cable and the length of the supplied hoses to the venturi assemblies.

Figure 2: Control and Maintenance Unit

During installation, check the length of the air supply lines.

XSV-05, XSV-05/R, & XSV-05/2R Single Conveying Units - Venturi Style

13 of 36

Page 14
Image 14
Sterling SSV-05R, SSV-052R operating instructions Installing the Control and Maintenance Unit