SKW-E
8.2. Electrical connection
»
The regulations of the local Electricity Board must be observed.
Before connection to the electricity supply, it should be ensured that the sup- ply voltage and the power frequency are in accordance with the data on the name plate of the machine.
The electrical connection may only be carried out by Sterling service staff or trained personnel authorized by Sterling.
It is not permitted for other persons to undertake the electrical connection.
All work is to be carried out with the equipment disconnected from electric power and compressed air supply.
The main switch must be freely accessible.
Ground the equipment against electrostatic charging.
If the solenoid valve is tension free the
8.2.1. Sterling Single Conveyor Unit with 110
The power consumption amounts to approx. 15 watt.
The operating voltage amounts to approx. 110 V/60 Hz.
Special voltages upon request.
Install the cable (2 x 0.75 mm², 30 cm long) from the solenoid valve of the pneumatic cylinder in the control system (please follow the connection diagram).
Install the cable (3 x 0.75 mm², 1.8 m long) from the control system of the
Or, if it is not long enough, install and mount a cable (at least 3 x 1 mm²) from the single conveyor unit to the
Follow the operating manual of the single conveyor unit.
Installation instructions