Sterling Plumbing SKW-E manual Connection to a conveyance control system, Skw-E

Models: SKW-E

1 42
Download 42 pages 1.49 Kb
Page 32
Image 32
8.2.3. Connection to a conveyance control system

SKW-E

8.2.2. Sterling Single Conveyor Unit with 24 V-Output Port

The power consumption amounts to approx. 15 watt.

The operating voltage amounts to approx. 24 V.

Install the cable (2 x 0.75 mm², 30 cm long) from the solenoid valve of the pneumatic cylinder in the control system (please follow the connection diagram).

Install the cable (3 x 0.75 mm², 1.8 m long) from the control system of the SKW-E in the control system of the single conveyor unit (please follow the connection diagram).

Or, if it is not long enough, install and mount a cable (at least 3 x 1 mm²) from the single conveyor unit to the SKW-E (please follow the connection diagram).

Follow the operating manual of the single conveyor unit.

8.2.3. Connection to a conveyance control system

»

The electrical connection to a conveyance control system may only be made by skilled personnel authorized by Sterling.

Other persons are not permitted to install electrical connections.

SM3-641

Installation instructions 8-4

Page 32
Image 32
Sterling Plumbing SKW-E manual Connection to a conveyance control system, Skw-E, Installation instructions