SKW-E
6.1. General information
The SKW-E has 2 input connecting branches (virgin material intake port, regrind intake port) and an output connecting branch leading to the conveyor unit.
With the SKW-E it is possible to convey two components to a hopper loader.
The SKW-E works in dependence on the conveying cycles of the conveyor unit. It is only in opera- tion when material is conveyed.
The SKW-E is available in 2 versions:
•Version 1 operation of SKW-E
SKW-E for connection to a Sterling single conveyor unit (230 V or 24 V output) or to a conveyance control system.
•Version 2
operation of conveyance control system
SKW-E for connection to a conveyance control system.
6.2. Control
6.2.1. Version 1
The control unit is installed on the base plate of the SKW-E or in a maximum distance of 3 meters.
The conveying ratio as well as the switching cycles are set by means of the keys on the front side of the control system.
Percentage key Arrow key | Display |
Control
Functional description 6-2