Sterling Plumbing SKW-E manual Determining the switching cycle duration, Skw-E, Start-up

Models: SKW-E

1 42
Download 42 pages 1.49 Kb
Page 17
Image 17
3.2. Determining the switching cycle duration

SKW-E

3.2. Determining the switching cycle duration

Measure the conveying time of the corresponding hopper.

Consult the table (see chapter accessories).

Look for the value in the column “conveying time”.

Select a number of switching cycles.

Press the percentage key.

By means of the arrow key, select the desired switching cycle.

Carry through one conveying procedure.

If you are not satisfied with the result, check the setting and correct, if necessary.

F

Example

No thick layers may form in the hopper loader.

Conveying time: 50 s

Conveying ratio: 40 % regrind, 60 % virgin material

Setting options for a conveying time of 50 s:

Conveying time

 

Number of switching cycles at cycle period (seconds)

 

 

 

 

 

 

 

 

 

 

 

 

(seconds)

50

45

40

35

30

25

20

15

10

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

50

1

1,1

1,3

1,4

1,7

2

2,5

3,3

5

10

 

 

 

 

 

 

 

 

 

 

 

SM3-641

Start-up 3-3

Page 17
Image 17
Sterling Plumbing SKW-E manual Determining the switching cycle duration, Skw-E, Start-up