Sterling Plumbing SKW-E manual Maintenance intervals, Skw-E

Models: SKW-E

1 42
Download 42 pages 1.49 Kb
Page 22
Image 22
5.1. Maintenance intervals

SKW-E

F

Please observe the maintenance intervals.

Before starting maintenance work, clean the equipment of oil, fuel or lu- bricants.

Ensure that materials and incidentals required for operation as well as spare parts are disposed of properly and in an environmentally sound manner.

Use only original Sterling spare parts.

Keep record of all maintenance and repair procedures.

5.1. Maintenance intervals

Daily:

Check warning signs on equipment for good legibility

 

and completeness.

 

Check the oil level in the oiler.

 

Empty the water separator.

 

Check operating pressure in the plant’s supply network

 

(max. 6 bar (87.02 PSI) system overpressure).

Every six months:

Check all electrical and mechanical connections for secure fit.

F

In case of soiled material or material with a high dust content, equipment should be checked regularly for smooth operation.

The indicated maintenance intervals are average values.

Check whether for your specific type of application, the maintenance in- tervals must be reduced.

SM3-641

Maintenance 5-2

Page 22
Image 22
Sterling Plumbing SKW-E manual Maintenance intervals, Skw-E