: SP-40 model

6. BATTERY INSTALLATION

 

 

 

(a) Attach terminals to a lead-acid battery already

 

 

 

Recommended Battery (Lead-acid type)

charged. Mount the battery onto the position as

Capacity

: 12V-36Ah or larger

 

specified below, with its terminals facing inward.

 

Size (Max)

: 10.2 x 5.1 x 8.1

[in.]

 

(b) Insert each long bolt through the specified hole,

[L x W x H]

: 260 x 130 x 205

[mm]

its tip pointing outward.

Make and Model

 

ENGLISH

(c) Put the supporting arm on the long bolts and

Interstate

tighten with the butterfly nuts. (Push the lead-acid battery all the way inward.)

(d) Arrange the wiring so that it won't be damaged by possible vibration caused by the engine.

(e) Only after checking that the engine's starter key is in the "OFF" position, securely connect the red cable, to the positive (+) terminal. And then connect the other cable to the negative (-) terminal.

Red cable : to the (+) terminal

Black cable : to the (-) terminal

CAUTION

Should the connection be made in incorrect manner, the engine will be broken.

1

Butterfly nut

 

2

Spring washer

Accessory parts

3

Battery bolt

 

4Battery stay

5Bolt and Nut

5

1

2

 

 

4

RED

3

CABEL

 

LESS THAN

 

205 mm [8.1 in.]

 

LESS THAN

LESS THAN

260 mm [10.2 in.]

130 mm [5.1 in.]

 

RED CABEL

FRANÇAISE

ESPAÑOL

7