Note: Framing dimensions in Figures 4 - 9 are calculated for a nailing flange depth of ¹⁄₂" (13 mm).
| Back Wall of |
| Back Wall of |
| Chase/Enclosure |
| Chase/Enclosure |
Outside Wall | Including Finishing | Outside Wall | Including Finishing |
Materials If Any. | Materials If Any. | ||
|
|
|
15¹⁄₂"
(394mm)
37" (940mm)
CF5500
Figure 4
Back Wall of
Chase/Enclosure
Including Finishing
Materials If Any.
41"
(1041mm)
13 ¹ "
(343mm)
29"
(737mm)
37" (940mm)
58 ¹ " (1473mm)
CF5500
Figure 5
19 ¹⁄₂"
(495mm)
41" (1041mm)
CF6500
Figure 7
| Back Wall of |
| Chase/Enclosure |
| Including Finishing |
| Materials If Any. |
47 ⁷ " |
|
(1216mm) | 14 ¹ " |
| |
| (362mm) |
33 ⁷ "
(860mm)
41" (1041mm)
67 ³ " (1721mm)
CF6500
Figure 8
|
| CF6500 - 8¹⁄₂" | |
|
| ||
|
| (216 mm) | |
|
| ||
3" | CF5500 - 7¹⁄₂" | ||
(191 mm) | |||
(76 mm) | |||
|
Figure 10
Step 3. Remove the nailing flanges from the lower control compartment and install in place with three (3) screws each. Align with the three holes on each side of the appliance (see Figure 11 ).
Nailing Flange
37 ¹⁄₄" |
| 42 ³⁄₈" | |
(946 mm) |
| (1076 mm) | |
|
| ||
15 | ¹⁄₂" | 19 ¹⁄₂" | |
(495 mm) | |||
(394 mm) | |||
41" | |||
37" |
| ||
| (1041 mm) | ||
(940 mm) |
| ||
|
|
Figure 11
All units come complete from the factory with an installed hood. Ensure that the hood is installed. If required, position the hood in the open area above the appliance door covering the diverter baffles. Insert the tabs, on each end of the hood, into the bracket at each end. Bend the two tabs over to secure.
Step 4. Position appliance into prepared fram- ing, secure with 6d nails at the nailing flange along each side.
6
CF5500
Figure 6
The header may be in direct contact with the top metal spacers, but must not rest on them or be notched to fit around them.
Step 2. Route a ¹⁄₂" (13 mm) gas line along the left or right side framing (see Figure 10 ).
CF6500
Figure 9
All appliances have a 3" long ³⁄₈" NPT nipple installed at the valve. To quickly and easily complete the gas line routing, use the gas flex line kit, Model GFLV.
NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE.
Step 5. Connecting Gas Line – Make gas line connections. All codes require a