
CFPF APPLIANCE SPECIFICATIONS
20"  | 
(508 mm)  | 
18"  | 
(457 mm)  | 
5 ¹⁄₂"
(140 mm)
42 ³⁄₄"
(1086 mm)
20"  | 
(508 mm)  | 
34"  | 
(864 mm)  | 
37"
(940 mm)
Open End
4 ¹⁄₂"  | 
(114 mm)  | 
4"  | 
(102 mm)  | 
40"
(1016 mm)
Front View
(CFPF)
⁵⁄₈"
(16 mm)3 ¹⁄₈"
(79 mm)
31³⁄₄"
(806 mm)
24"  | 
(610 mm)  | 
J Box/Gas Line
Opening
(Both Sides)
End View
Figure 6
CFPF FRAMING SPECIFICATIONS
Gas
Line
A
C
Framing Dimensions
A  | 22  | ³⁄₄" (578 mm)* | 
B  | 40  | ¹⁄₈" (1016 mm) Min. | 
C  | 43" (1092 mm) Min. | |
*Note: Framing dimensions calculated for ⁵⁄₈" drywall finish.
Top View
2 x 4 Outside  | 
  | Energy Wall  | 
  | 
Wall  | 
  | 
  | Gas Line  | 
  | 
  | *  | 
  | 
  | Bracket  | Bracket  | Drywall  | 
  | Drywall  | ||
  | 
  | 
  | 
B
Figure 7
Framing Top View
* ¹⁄₂" (13mm) Required Air Space Clearance
Figure 8
NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE.
7