14
Operating Procedures Model 432
Holding the beater securely, slide the beater into the
freezing cylinder and align the hole at the rear of t he
beater with the flats on the end of the drive shaft .
Slide the beater the remainder of the way into the
freezing cylinder and over the end of the drive shaft.
The beater assembly will not prot rude beyond the front
of the freezing cylinder.
Figure 8
Step 3
Install the white plastic guide bearing on the short end
of the torque rotor. Slide the o- ring into t he groove on
the long end of the torque rotor and lubricate the
o- ring. Do not lubricate the guide bearing.
Figure 9
Step 4
Insert the torque rotor end with the guide bearing into
the pilot hole in the center of the drive shaft. T he hole
in the torque rotor shaft should be rotat ed to the 12
o’clock position.
Figure 10
Step 5
Assemble the freezer door with the “Ice Bust er”( door
spout clearing device). To assemble the door with the
ice buster, install the o- rings on the draw valve and
lubricate.
Figure 11
Insert the draw valve into the door, leaving
approximately half of the valve sticking out the top of
the door.
Figure 12