16
Operating Procedures Model 432
Step 7
Position the torque arm by inserting it throught he slot
in the torque switch arm and down into the hole in the
torque rotor which protrudes from the door. Verify
proper installation by moving the torque rotor back and
forth to be sure it moves freely and easily.
Figure 18
Step 8
Install the front drip pans. Slide the long drip pans into
the holes in the front panel.
Figure 19
Step 9
Install the front drip tray and splash shield beneath the
door spouts.
Figure 20
Step 10
Lay the air/mix feed tube (optional) in the bottom ofthe
mix hopper.
Figure 21
Repeat these steps for the other sid e of the unit.