Operator’s Checkout Procedure

Before proceeding, read At A Glance starting on page 2-1.

This procedure is designed for operator familiarization and for checking basic instrument operation (not measurement quantities or specifications). All illustrations are of the 1750A unless otherwise noted.

If performing this procedure reveals improper instrument operation, first check the operation of the associated equip- ment. If the associated equipment is operating normally, refer the 1740A/1750A-Series to qualified service personnel for repair or adjustment.

Required Equipment

The following equipment is required to perform this proce- dure:

1.Television Signal Generator with:

Composite Color Bars

For example: TEKTRONIX TSG 130 Series Signal Generator.

2.Coaxial Cable, 75Ω (5)

For example: 42-inch RG59U (Tektronix Part No. 012-0159-00)

3.75Ω Terminators, End-line (4)

For example: (Tektronix Part No. 011-0102-00)

Initial Equipment Connections

HConnect the 1740A/1750A-Series to an appropriate AC power source.

1740A/1750A Series Waveform/Vector Monitor User Manual

2-11