Therma-Tru Hinged Patio Door System Single Panel Assembly Unit manual Flange Installation

Models: Hinged Patio Door System Single Panel Assembly Unit

1 16
Download 16 pages 37.67 Kb
Page 11
Image 11
FLANGE INSTALLATION

8

FLANGE INSTALLATION

Inswing

Outswing

NOTE: Inswing application shown.

 

lange

 

F

Align

Side

Install Top Flange

Center top flange into head jamb kerf and press into place using a rubber mallet if necessary.

Align and Install Side Flanges

Align edge of side flange with bottom of side jambs.

Firmly press into kerf in jamb using a rubber mallet if necessary.

Flange will be set back approximately 1/2” from top edge of jamb.

Top

Flange

 

Flange

 

Side

 

 

 

 

 

 

 

 

10

Page 11
Image 11
Therma-Tru Hinged Patio Door System Single Panel Assembly Unit manual Flange Installation, Install Top Flange