Frame Assembly

NOTE:

A large work area is needed to assemble the frame kit. Cover area with cardboard from one or more door panel cartons to protect frame parts and floor.

1

LAY FRAME COMPONENTS ONTO WORK AREA

Lay parts on floor and position sill, head,

Head Jamb

and side jambs with exterior side up.

Side Jamb

 

Side Jamb

Exterior

Sill

2

IF APPLICABLE, INSTALL TOP-HUNG SCREEN TRACK

For units using the wide profile top-hung screens, install top-hung screen track and adapter into head jamb prior to assembly.

Reference steps 1 thru 4 of the “Wide Profile” Screen Installation - Sliding Patio instructions, included with the top-hung screen, for complete details.

3

INSTALL SILL CAP BASE

Engage groove in sill cap base with sill.

Rotate sill cap base down to snap into place. Use a rubber mallet if necessary.

Sill cap base

3

Page 4
Image 4
Therma-Tru Smooth-Star, Fiber-Classic LAY Frame Components Onto Work Area, If APPLICABLE, Install TOP-HUNG Screen Track