Therma-Tru Fiber-Classic, Smooth-Star manual Level Sill, Plumb Side Jambs

Models: Fiber-Classic Smooth-Star

1 24
Download 24 pages 62.98 Kb
Page 9
Image 9
LEVEL SILL

10

LEVEL SILL

Sill MUST be flat and level.

Check and make any necessary adjustments.

If necessary, add temporary blocking under projecting exterior edge of sill to serve as support during construction.

11

PLUMB SIDE JAMBS

Interior

Jambs must be plumb and straight.

Shim as necessary at screw locations to remove any bow.

Fasten system to rough opening using staples, nails, or screws through sealing fin at the corners.

Fasten through every third opening in the sealing fin.

If needed, jambs can be back filled with insulation.

Shims

8

Page 9
Image 9
Therma-Tru Fiber-Classic, Smooth-Star manual Level Sill, Plumb Side Jambs