All installations and services must be performed by qualified service personnel.
CAUTION: A permanent opening with a minimum of 50 square inches of unobstructed infiltration (free area) for ventilation and combustion air must be provided to the interior of the structure. Additional
Refer to the assembly installation instructions included with
3.Coil Cabinet: CE111S / CE211T
The CE111S / CE211T coil cabinet (figure 1C) is for applications requiring air conditioning. The coil cabinet is designed to have the combustion air brought in from the bottom thru a flexible hose, supplied with the cabinet. Refer to section G Combustion air of this manual for further instructions on the combustion air termination and connections. For additional information refer instructions provided with the coil cabinet.
E. ALCOVE INSTALLATION
In this application, a minimum of 18 inches of clearance must be provided to the front of the unit. Refer to Figure 4.
Alcove installations must use the No. 70 mobile home base.
Note – access to diagnostic view port.
Refer to section G. COMBUSTION AIR for additional combustion air requirements.
Figure 4
14