Thermo Products OD6RA072DV5B, OD6FA072DV5R COMBUSTION HEAD SETTING FOR 2-STAGERIELLO BURNER

Models: OD6FA072D48B OD6FA072DV5B OD6RA075DV5R OD6FA072D48R OD6RA072D48R OD6RA072D48B OD6FX072DV5R OD6RA072DV5B OD6RX072DV5R OD6FA072DV5R

1 76
Download 76 pages 60.97 Kb
Page 42
Image 42
COMBUSTION HEAD SETTING FOR 2-STAGE RIELLO BURNER:

Figure 19: Preliminary Adjustment of Burner Air Band and Air Shutter

i.When ignition is established, make a preliminary burner air adjustment to attain a clean combustion flame. Generally, the burner bulk air band should be about 3/16 inch open and the opening of the burner air shutter set in the range of “2” to “7”, refer to Figure 19.

Replace the inspection cover above the burner.

j.After the appliance is warmed up to a steady state condition (about 15 minutes), the final burner adjustment should be made using combustion instrumentation for smoke, carbon dioxide (CO2)

or excess oxygen (O2), and flue gas temperature. In order to achieve the most efficient combustion, the following steps must be taken:

COMBUSTION HEAD SETTING FOR 2-STAGE RIELLO BURNER:

This is done when fitting the nozzle, with the blast tube removed. It depends on the output of the burner and is carried out by rotating the regulating rod, till the terminal plane of the blast tube is level with the set-point, as indicated in the schedule.

In figure 20 the combustion head is set for an output of 0.75 GPH at 130 psi, while the shutter is level with set- point 2.5, as required by the above schedule.

Figure 20

39

Page 42
Image 42
Thermo Products OD6RA072DV5B, OD6FA072DV5R, OD6RX072DV5R, OD6FX072DV5R COMBUSTION HEAD SETTING FOR 2-STAGERIELLO BURNER