Assembly Section 2-10
ASSEMBLY
SWITCH BOX WIRING
Refer to the Parts section for wiring diagrams. Remove top instrument panel
(tach, and hour meter) for access to the wires.
Route the red and green wire from the switch box wires from the switch box to
the bottom right corner of the instrument panel near window. Connect the red wire to
the white wire. (“hot” when key is in “on” position)
NOTE ONLY FOR ELECTRONIC VALVE: +12 VOLTS ELECTRICAL POWER
MUST BE TAKEN FROM A SOURCE LOCATION WHERE IT IS LIVE ONLY
WHEN THE IGNITION SWITCH IS IN THE “ON” POSITION. THIS WIRE MUST
BE FUSED AT THE SOURCE LOCATION.
Route the white wire to connected the hydraulic solenoid valve.
The switch box is to be secured to the operators side of the control handles, or
valve stand.
The green wires will connect to the neutral safety switch wires (white with yellow
stripe), under the cowl panel.

BEFORE WIRING AFTER WIRING

HYDRAULIC TANK INST ALLATION
Install all fittings and tubes into tank and tank filter as shown in parts section
illustration. Install the temperature sensor / sight gauge into back side of the tank.
And attach the tank mount to the main frame with the hardware shown in the parts
section.
Place the tank in the mounting bracket on the main frame as shown in the parts
section. Secure the tank with the tank channel mount by placing the channel mount
on top of the tank and the washers over the holes. Thread the tie bolts through the
washers and holes to the threaded holes on the main frame. Tighten the tank channel
mount by using the hex heads on the end of the tie bolts.
Install the filter gauge into the filter housing so that it points to the rear of the tractor
and is clearly visible to the operator. Locate the tank breather and reducer bushing
(bushing may be already installed in the tank along with many of the for-mentioned
parts). These will be installed after tank is filled.