user manual
TA-890
TA-890 user manual
Page 3
Setting up a Venue - Overview...............................................................................................................17
Running Turbosound GigMate™ / EASE Focus for the first time: .......................................................18
Designing a system.................................................................................................................................20
Changing the system .............................................................................................................................. 23
Safety Notes on Rigging.........................................................................................................................25
Sample Certificate of Load Test .............................................................................................................26
Flying Hardware ......................................................................................................................................27
Wide and Narrow Flybar Settings.......................................................................................................... 27
Figure 1. Single A-System Flybar FB-890/1A .........................................................................................28
Figure 2. Double A-System Flybar FB-890/2A........................................................................................29
Figue 3. Triple ‘A’ System Flybar FB-890A/3W ......................................................................................30
FC-890 Flying Chains............................................................................................................................... 31
TS-890 Tilting Straps...............................................................................................................................31
Three-wide hang using MB-890, EB-890, FB-890/2A and FB-890/1A .................................................... 32
Four-wide hang using MB-890 and FB-890/2A ......................................................................................33
Integral Flying Hardware ........................................................................................................................ 34
‘A’ System Flygear ..................................................................................................................................34
1. Drop Link..............................................................................................................................................35
2. Swing Latch ......................................................................................................................................... 35
Connecting Flying Chains to the Cabinet...............................................................................................35
Figure 1 – insert cabinet link Figure 2 – release swing latch.............................................................35
Connecting Cabinets - ‘A’ System.......................................................................................................... 35
Setting Vertical Angles – ‘A’ System...................................................................................................... 36
Attaching the Tilt Straps .........................................................................................................................37
Turbobass Directivity ..............................................................................................................................38
Bass Enclosure arraying..........................................................................................................................38
Aiming - directivity of the stack..............................................................................................................38
The typical Left to Right problem...........................................................................................................40
Creating Directional Bass arrays: ...........................................................................................................41
Bass in a line:........................................................................................................................................... 41
Fanned bass.............................................................................................................................................42
Bessel Array............................................................................................................................................. 43
General observations of long lines of bass ...........................................................................................43
End firing array........................................................................................................................................44
Summing up............................................................................................................................................45
Ground stacking ...................................................................................................................................... 46
LMS SERIES Loudspeaker Management SystemS ....................................................................................47