U-Line CO2175, CO1175 manual Factory-Installed Drain Pump

Models: CO2175 CO1175

1 19
Download 19 pages 26.88 Kb
Page 15
Image 15

Factory-Installed Drain Pump

If your drain line will run up to a stand pipe, disposal or spigot assembly, or does not otherwise meet the requirements for a Gravity Drain, you may have ordered the CLR2160 or CLRCO2175 with a U-Line P60 Drain Pump. See Below for typical installations requiring a Drain Pump. If you need to install a P60 Drain Pump into your unit, see Locally-Installed Drain Pump on Page 14.

Typical Installations Requiring a Drain Pump

Stand Pipe

P60 Pump Required

 

Waste

 

Shut-Off

 

Valve

 

Cold

Hot

Water

Water

 

Waste

 

Disposal Assembly

P60 Pump Required

Air Gap

(Optional Hook-Up)

 

Waste

 

Cold

Hot

Water

Water

 

 

Shut-Off

 

Valve

Y-Branch Tailpiece

P60 Pump Required

Air Gap

(Optional Hook-Up)

 

Waste

 

Shut-Off

 

Valve

 

Cold

Hot

Water

Water

 

IMPORTANT

 

Before installing your U-Line CLR2160 or CLRCO2175 with Factory-Installed U-Line P60 Pump, it is extremely important to check and test all hose connections at the drain pump. There is a possibility that hose connections may have loosened during shipment.

To check and test hose connections:

1.Make certain the unit is not plugged into an electrical outlet.

2.Carefully push the power cord grommet through the hole in the back panel.

3.Remove 12 screws and back panel.

Back

Panel

Screws

Grommet

Water

Drain Connection

PowerFitting

Cord

IMPORTANT

Back panel serves as a guard. DO NOT put your hands inside the ice maker cabinet or attempt to touch any components except the discharge tube during testing.

4.Check that the clamps and hose connections are tight at the following areas:

Discharge tube (A)

Drain tube (B)

Vent tube (C)

B B

C C

A

Back View

Side View

5.Place a suitable container beneath the pump’s discharge tube. (The bucket must be able to hold a minimum of one gallon.)

6.Plug the ice maker power cord into a properly grounded, polarized electrical outlet.

7.Place the unit into OFF mode by holding power key for 10 seconds. Not doing this will cause the unit to start the fill cycle which will run for 3 minutes.

8.Verify pump operation by pouring one gallon of water into the ice storage bin of the ice maker. The pump should energize and pump the water into the container.

9.At this time, verify that all tube and clamp connections are tight and leak-free.

10.Unplug unit power cord from electrical outlet.

11.Reinstall back panel.