Vanguard Heating NLFB32NC, FB32CA Continued, Power Cord, Built-InInstallation of Blower Accessory

Models: NLFB32NC NLFB32C FB32CA FB32NCA

1 24
Download 24 pages 59.69 Kb
Page 11
Image 11
Power Cord

INSTALLATION

Continued

7.Plug in blower power cord.

a.If your firebox is installed as a freestanding unit, determine whether the power cord will exit the left side or the right side of the firebox. Install 1 plastic bushing provided into the 1 1/2" hole in the floor support on the exit side. Install the second plastic bushing provided into the 1 1/2" hole in the outer casing through which the power cord will exit (see Figure 11). Route power cord through both plastic bushings and plug the power cord into a 3-prong grounded wall receptacle near the firebox.

b.If your firebox installation is recessed and/or pre-wired, see Built-In Installation of Blower Accessory, column 2.

8.Turn on power to duplex outlet if previously turned off per the warning in step 1.

9.Check to make sure that the power cord is com- pletely clear of the blower wheel and that there are no other foreign objects in blower wheel. Turn blower on and check for operation.

Built-In Installation of Blower Accessory WARNING: Never touch the blower wheel while in operation.

10.Peel off the backing paper and stick the sup- plied wiring diagram decal on the firebox bottom approximately 12" in front of the blower.

11.Replace bottom of firebox. Note: Make sure the back of the firebox bottom slides under the rear of the firebrick (lift the firebrick up if necessary.)

12.Reattach firebox bottom using 4 screws re- moved in step 1. Note: Discard the remaining hardware items.

13.Install the log set heater according to the instal- lation instructions supplied with the heater.

Plastic

Operating the Blower Bushing

Figure 11 - Installing Plastic Bushing for

Power Cord

NOTICE: A qualified electrician must connect electrical wiring to duplex outlet for built-in instal- lation. Follow all local codes. In absence of local codes follow The National Electrical Code ANSI/NFPA 70.

Built-In Installation of Blower Accessory

1.Before replacing bottom of firebox, remove screw holding duplex outlet to the support bracket in the bottom of firebox. Remove duplex outlet.

2.Clamp electrical cable into firebox through smallest hole in outer casing using strain relief provided.

3.Route wires from electrical box through hole in side of heater and hole in support bracket (see Figure 12).

4.Connect wires from the electrical box to duplex outlet. Match wire colors to those indicated on duplex outlet. Be sure to connect ground wire.

5.Replace duplex outlet with screw.

6.Plug blower power cord into duplex outlet.

7.Replace bottom of firebox.

 

Cables From

Support Bracket

Electrical Source

 

Blower

 

 

Duplex

 

Outlet

Blower

Screw

 

Power Cord

Figure 12 - Routing Blower Accessory

Power Cord for Built-In Installation

Operating the Blower

 

Light your gas appliance with the blower off. After

about 15 minutes, turn the blower on to deliver

heated air at the top louvers. The blower features

a variable control which allows you to select the

speed you desire.

 

Note: Periodically check the louvers of the firebox

and remove any dust, dirt, or other obstructions.

105604-01H

www.desatech.com

11

Page 11
Image 11
Vanguard Heating NLFB32NC, FB32CA Continued, Power Cord, Built-InInstallation of Blower Accessory, Operating the Blower