1.Locate your fireplace.

2.Plumb to centre of the (4") 90o transition elbow (7TDVRT90) from ceiling above and mark position.

3.Cut opening equal to 9-3/8" x 9-3/8" (240 mm x 240 mm).

4.Proceed to plumb for additional openings through the roof. In all cases, the opening must provide a minimum of 1 inch clearance to the vent pipe, i.e., the hole must be at least 9-3/8" x 9-3/8" (240 mm x 240 mm).

5.Place fireplace into position and secure to floor.

6.Place firestop(s) 7DVFS into position and secure. (Fig. 63)

7.Install roof support (Fig. 36) and roof flashing making sure upper flange of flashing is below the shingles. (Fig. 64)

8.Install appropriate pipe sections until above the flash- ing. (See Fig. 62 for #'s 7, 8 and 9).

9.Install storm collar and seal around the pipe.

10.Add additional vent lengths for proper height. (Fig. 62)

Attic

 

 

Insulation

 

 

Shield

11"

 

 

 

JOIST

 

 

Fig. 63

Ceiling

11"

UPPER FLOOR

Installation

 

 

 

 

 

JOIST

 

 

FIRESTOP

 

 

SPACER

 

 

NAILS (4)

Fig. 63 If there is a room above ceiling level, firestop spacer must be installed on both the bottom and the top side of the ceiling joists. If an attic is above ceiling level a 7DVAIS (Attic Insulation Shield) must be installed.

Fig. 64 The enlarged ends of the vent section always face downward.

Fig. 64

SHEETMETAL 1.Locate your fireplace. SCREWS (#5) Ñ

3 PER JOINT

Manual background SEALANT

Manual backgroundManual background STORM COLLAR