Vertical Through-the-Roof Installation

Chateau™

Max. Height

40' (12 m)

Min. Height

20' (6 m)

Max. 20' (6 m)

Pipe Straps Every 3’ (914mm)

Max. 8' (2.4m)

4

1 + 2 + 3 + 4 = 270°

3

12

Minimum 2’ (610mm)

Before Any Elbow

FP1244a

Fig. 28 Support straps for horizontal runs.

Up to two (2) 30° or 45° elbows may be used within the horizontal run. For each 30° or 45° elbow used on the horizontal level the maximum horizontal length must be reduced by 18” (457 mm). Example: Maximum horizontal length

0 x 30° or 45° elbows = 10’ (3 m)

1x 30° or 45° elbows = 8’6” (2.6 m)

2 x 30° or 45° elbows = 7’ (2.1 m)

A minimum of an 12’ (3.7 m) vertical rise.

Two sets of 30° or 45° elbows offsets within these vertical installations. From 0 to a maximum of 8’ (2.4 m) of vent pipe can be used between elbows. (Fig. 29)

SKCS8 must be used to support offsets. (Fig. 32) This application will require that you first determine the roof pitch and use the appropriate starter kit. (Refer to Venting Components List)

The minimum height of the vent above the highest point of penetration through the roof is 2’ (610 mm). (Fig. 33)

 

 

 

 

 

FP1245a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FP1245a

 

 

Fig. 29 Typical offset application.

Vertical Through-the-Roof Installation

1.Locate your fireplace.

2.Plumb to center of the (8”) flue collar from ceiling above and mark position.

3.Cut opening equal to 14¹⁄” x 14¹⁄” (368 mm x 368 mm).

4.Proceed to plumb for additional openings through the roof. In all cases, the opening must provide a minimum of 1¹⁄” (38 mm) clearance to the vent pipe, i.e., the hole must be at least 14¹⁄” x 14¹⁄” (368 mm x 368 mm).

5.Place fireplace into position.

6.Place firestop(s) SKFS2A or Attic Insulation Shield AIS-SK into position and secure. (Figs. 30, 31)

7.Install roof support (Fig. 32) and roof flashing making sure upper flange of flashing is below the shingles.

8.Install appropriate pipe sections until the venting is above the flashing.

9.Seal around the pipe.

10.Add additional vent lengths for proper height. (Fig. 33)