Vulcan-Hart VHL2G Gas Boiler Fig, Electric Boiler Fig, Probe Housing Blowdown Valve

Models: VHL2G

1 32
Download 32 pages 44.25 Kb
Page 15
Image 15
Gas Boiler (Fig. 3)

Gas Boiler (Fig. 3)

PROBE HOUSING

BLOWDOWN VALVE

WATER INLET VALVE

Electric Boiler (Fig. 4)

PROBE HOUSING

BLOWDOWN VALVE

CONDENSATE WATER

INLET VALVE

Electric Boiler (Fig. 4)PRESSURE RELIEF VALVE

GAS VALVE

Probe Housing Blowdown ValveMANUAL VALVES

WATER LEVEL GAUGE

PL-41749-1

Fig. 3

Water Inlet ValvePRESSURE RELIEF VALVE

Gas Valve (Gas-Powered Boilers Only)MANUAL VALVES

WATER LEVEL GAUGE

BOILER FILL VALVE

PL-41748-1

Fig. 4

Probe Housing Blowdown Valve

Open periodically (monthly) to blow down the probes and to remove sediment and scale buildup.

Located toward the back left side. Wait until the boiler is cool before opening the valve.

Water Inlet Valve

• Located toward the bottom center in the boiler.

Gas Valve (Gas-Powered Boilers Only)

• Located behind the door. Turn counterclockwise to ON; clockwise to OFF.

– 15 –

Page 15
Image 15
Vulcan-Hart VHL2G operation manual Gas Boiler Fig, Electric Boiler Fig, Probe Housing Blowdown Valve, Water Inlet Valve