INSTALLATION
3) Install 3 AAA alkaline batteries in transmit- |
ter and 4 AA alkaline batteries in the |
FINAL CHECK | CAUTION |
receiver. Install the receiver and its cover |
in the wall. Switch the remote receiver to |
"remote" mode. The remote control is now |
ready for operation. |
Before leaving this unit with the customer, the installer must ensure that the appliance is firing correctly. This includes:
1)Clocking the appliance to ensure the cor- rect firing rate (rate noted on label) at 15 minutes.
2)If required, adjusting the primary air to ensure that the flame does not carbon. First allow the unit to burn for 15 min. to stabilize.
3)Check for proper draft.
Any alteration to the product that causes sooting or carboning that results in damage to the exterior facia is not the responsibility of the manufacturer.
This heater does not require a 120V A.C. supply for operation. In case of a power failure, the burner switch and the optional remote control/thermostat will continue to operate. However, a 120V A.C. power supply is needed for the fan/blower operation.
WIRING DIAGRAM
Caution: Ensure that the wires do not touch any hot surfaces and are away from sharp edges.
CAUTION: Label all wires prior to disconnection when servicing con- trols. Wiring errors can cause im- proper and dangerous operation.
If any of the original wires as supplied with the appliance must be replaced, it must be replaced with CSA type SEW (200oC) or its equivalent.
WARNING: Electrical Grounding Instructions
This appliance is equipped with a three pronged (grounding) plug for your protection against shock hazard and should be plugged directly into a properly grounded
14 | Waterford |