10.Apply grease to an M10 x 77mm Bolt (79).

Attach the Pivot Frame (5) to the Top Frame (4) with the M10 x 77mm Bolt (79) and an M10 Locknut (56). Do not overtighten the Locknut; the Pivot Frame must pivot easily.

11.Attach the two Arm Pins (40) to the Pivot Frame

(5)with two M4 x 20mm Self-tapping Screws

See the inset drawing, insert the Arm Pins (40) into the indicated holes in the Upright (3).

12.Apply grease to an M10 x 51mm Bolt (66).

Attach a Cable Pivot (39) to the Left Arm (10) with the M10 x 51mm Bolt (66) and an M10 Locknut (56). Do not overtighten the Locknut; the Cable Pivot must pivot easily.

Wet the inside of a Large Foam Pad (42) with soapy water. Slide the Large Foam Pad onto the Left Arm (10).

Attach a Handle (11) to the Left Arm (10) with two M10 x 25mm Button Screws (77) and two M10 Washers (57).

Assemble the Right Arm (9) in the same way.

10

Gtease

11

69

/43°¸

12

11

57

11

Page 11
Image 11
Weider 831.14922.0 user manual 43¸