21.Route the Low Cable (53) through the Upright
(3)and under a Thick Pulley (48).
Attach the Thick Pulley (48) inside the Upright
(3)with an M10 x 46mm Bolt (81) and an M10 Locknut (56).
22.Route the Low Cable (53) over a Thick Pulley (48).
Attach the Thick Pulley (48) and two Half Guards (43) to the Double
23.Route the Low Cable (53) under a Thick Pulley (48).
Attach the Thick Pulley (48) and two Half Guards (43) to the Base (1) with an M10 x
46mm Bolt (81) and an M10 Locknut (56). Make sure that the Half Guards are on the outside
of the bracket as shown.
21 | _q |
/
81
22
23
56 43
15