FRAME ASSEMBLY
1.
Make sure that you understand all of the information on page 5 before you begin assembling the weight system.
Locate and open the parts bags labeled “FRAME
ASSEMBLY 1” and “FRAME ASSEMBLY 2.”
Press a 2” Square Inner Cap (105) into the open end of the Long Base (120).
Insert eight 5/16” x 2 1/2” Carriage Bolts (110) up through the Long Base (120) and the Short Base (2)
as shown. Note: It may be helpful to place tape over the heads of the Carriage Bolts to hold
them in place.
Attach the Short Base (2) to the Long Base (120)
with two 5/16” x 2 3/4” Bolts (85), the Long Frame Plate (71), and two 5/16” Nylon Locknuts (86).
2.Attach the Outer Cap (24) to the Short Base (2) with two #8 x 3/4” Screws (98).
Press two 2” x 3” Inner Caps (58) into the Foot
Plate (53). Attach the Foot Plate to the Long Base
(120)with two 5/16” x 2 1/2” Carriage Bolts (110) and two 5/16” Nylon Locknuts (86).
3.Attach the tether on the Pin (112) to the Long Base
(120)with a #10 x 1” Screw (14).
Attach the four Knee Rest Bumpers (123) to the
Squat Knee Rest (41) with four #10 x 1” Screws (14). Attach the Squat Knee Rest to the Long Base
(120)with a 3/8” x 3 1/4” Bolt (96) and a 3/8” Nylon
Locknut (87). Do not overtighten the Nylon
Locknut; the Squat Knee Rest must be able to pivot.
6
1 |
|
|
|
|
|
|
|
| 71 | 85 |
|
|
|
|
|
| |
| 110 |
|
| 120 |
|
| 86 |
|
|
| |
|
|
|
|
| |
|
| 2 |
|
|
|
|
| 86 |
|
|
|
|
| 110 |
|
|
|
|
| 110 |
| 110 | 105 |
|
|
|
|
| |
2 | 110 | 53 |
|
|
|
|
|
|
|
| |
|
|
| 58 |
|
|
|
|
| 86 |
| |
|
|
|
|
| 120 |
| 58 | 86 |
|
|
|
|
|
|
|
| |
|
|
| 2 |
|
|
|
| 24 |
|
|
|
|
| 98 |
|
|
|
3 |
|
|
|
|
|
|
| 14 | 112 | 41 |
|
|
|
| 96 | 123 | |
|
|
|
|
| |
|
| 120 |
|
|
|
|
| 87 |
|
| 14 |
|
|
|
|
| |
|
| 123 |
| 123 |
|
|
|
|
|
| |
|
|
| 14 |
|
|