45.Remove the M10 Nylon Locknut (90) used in step 43.
Wrap the Low Cable (71) under a 90mm Pulley (35). Attach the Pulley and a Cable Trap (38) to the M10 x 121mm Bolt (102) used in step 43 with the M10 Nylon Locknut (90). Make sure the
Cable Trap is positioned to hold the Cable in the groove of the Pulley.
46.Attach the Low Cable (71) to the Leg Lever (13) with an M8 x 68mm Shoulder Bolt (108), an M8 Washer (100), and an M8 Nylon Locknut (86).
Make sure that the flat side of the eyelet on the cable (see the inset drawing) is against the leg lever.
47.Identify the Press Cable (72). It is approximately 387 5/8” long and it has a ball on one end and a threaded shaft on the other.
Wrap the Press Cable (72) over a 90mm Pulley
(35).Attach the Pulley to the Press Top Frame (9) with an M10 x 89mm Bolt (111), an M10 Washer (97), and an M10 Nylon Locknut (90). Make sure the Cable is between the Pulley and the pin on the Press Top Frame.
48.Route the Press Cable (72) over the 90mm Pulley
(35)that was attached to the Press Top Frame (9) in step 16. Make sure the Cable Trap (38) is positioned to hold the Cable in the groove of the Pulley. Properly tighten the M10 Nylon Locknut (not shown) attached to the M10 x 97mm Bolt (77).
45 |
|
|
|
|
| 71 |
|
4 |
|
|
|
| 38 |
|
|
102 | 35 | 90 | |
|
| ||
46 |
|
|
|
100 |
|
|
|
86 |
|
|
|
13 |
|
|
|
|
| 71 | 108 |
|
|
| |
|
|
| Flat |
|
|
| Side |
47 |
|
|
|
90 | 97 |
|
|
| 9 |
|
|
| Pin | 35 | 111 |
|
| ||
|
|
| |
| 72 |
|
|
48 |
|
|
|
|
|
| 38 |
| 9 |
| 35 |
|
| 77 | |
|
|
| |
|
|
| 72 |
19