CABLE ASSEMBLY

23.Route the Long Cable (72) around the 3 1/2Ó Pulley (15) on the Top Frame (55). Tighten the 3/8Ó Nylon Locknut (21) and the 3/8Ó x 2Ó Bolt (not shown).

See inset drawing. Wrap the Long Cable (72) around a 3 1/2Ó Pulley (15). Attach the Pulley and a Cable Trap (66) to the bracket on the Stabilizer (5) with a 3/8Ó x 2Ó Bolt (12) and a 3/8Ó Nylon Locknut (21). Be sure that the

Cable Trap is turned to hold the Cable in place.

24.Wrap the Long Cable (72) around a 3 1/2Ó Pulley (15). Attach the Pulley and a Cable Trap (66) to the Squat Arm (84) with the 3/8Ó x 2 1/4Ó Bolt (94) and a 3/8Ó Jam Nut (92). Be sure that the 3/8Ó Jam Nut is on the side shown and that the Cable Trap is posi- tioned to hold the Cable in place.

12

23

 

 

 

55

 

 

 

15

 

 

 

21

 

 

 

 

 

 

72

 

 

12

 

 

72

66

15

 

 

 

 

 

 

 

5

 

 

 

 

21

 

 

15

 

 

 

5

 

 

 

21

 

24

 

 

 

66

15

 

 

94

 

 

 

 

 

 

84

 

 

92

 

 

 

Bracket

 

 

 

72

 

Page 12
Image 12
Weider 8530 manual Cable Trap is turned to hold the Cable in place