21.Route the Long Cable (41) over a 3 1/2” Pulley (45). Attach the Pulley and a Cable Trap (44) to the bracket on the Top Frame (10) with a 3/8” x 2” Bolt (74) and the 3/8” Nylon Locknut (84). Be sure that the Cable is in the groove of the Pulley and that the Cable and Pulley move smoothly.

22.Attach the Long Cable (41) to the Small “U”- Bracket (25) with a 1/4” Nylon Locknut (82) and a 1/4” Washer (81). See the inset drawing. Do not overtighten the Nylon Locknut; it should be threaded onto the end of the Cable only two turns, as shown.

Attach the Small “U”-Bracket (25) to the Weight Tube (26) with the 5/16” x 1 3/4” Bolt (75) and a 5/16” Nylon Locknut (83).

23.Locate the Short Cable (42). Route the Short Cable under a Pro 3 1/2” Pulley (94). Attach the Pulley and the 5/8” x 9/16” Spacer (58) to the lower hole in the Press Frame (13) with a 3/8” x 3 3/4” Bolt (70), a 3/8” Washer (86), and a 3/8” Nylon Locknut (84). Be sure that the end of the

Cable with the ball is on the indicated side of the Pulley.

24.Wrap the Short Cable (42) around a 3 1/2” Pulley (45). Attach the Pulley and a Cable Trap (44) to the lower hole in the Front Upright (4) with a 3/8” x 3 3/4” Bolt (70), a 3/8” Washer (86), and a 3/8” Nylon Jamnut (92). Be sure that the Cable Trap is turned to hold the Cable in place and that the Cable is routed around the Pulley as shown.

21

Bracket

 

 

 

 

 

 

 

84

10

 

 

 

 

 

 

 

45

44

74

 

 

 

41

 

22

 

 

 

 

41

 

 

 

 

 

 

 

 

 

 

75

 

 

 

 

 

25

41

 

 

83

 

81

 

 

 

 

82

25

 

 

 

 

26

82

 

 

 

 

 

23

 

 

 

 

 

84

94

 

 

 

 

Ball

 

 

 

 

86

 

58

 

 

 

 

 

 

42

 

 

13

70

 

 

 

 

 

24

 

 

 

 

 

70

 

4

 

 

 

86

44

 

 

 

 

 

 

 

 

 

42

45

92

 

12

Page 12
Image 12
Weider WESY29510 user manual