Woods Equipment RCC42 manual Dealer Service, U-JointAssembly

Models: RCC42

1 52
Download 52 pages 58.98 Kb
Page 30
Image 30
U-Joint Assembly

2.With snap rings removed, support drive in vise, hold yoke in hand and tap on yoke to drive cup up out of yoke. See Figure 20.

Figure 20. Remove Bearing Cups

3.Clamp cup in vise as shown in Figure 21 and tap on yoke to completely remove cup from yoke. Repeat Step 2 & Step 3 for opposite cup.

Figure 21. Remove Bearing Cups

4.Place universal cross in vise as shown in Figure 22 and tap on yoke to remove cup. Repeat Step 3 for final removal. Drive remaining cup out with a drift and hammer.

Figure 22

U-Joint Assembly

1.Place seals securely on bearing cups. Insert cup into yoke from outside and press in with hand pressure as far as possible. Insert journal cross into bearing cup with grease fitting away from shaft. Be careful not to disturb needle bearings. Insert another bearing cup directly across from first cup and press in as far as possible with hand pressure.

Trap cups in vise and apply pressure. Be sure journal cross is started into bearings and continue pressure with vise, squeezing in as far as possible. Tapping the yoke will help.

2.Seat cups by placing a drift or socket (slightly smaller than the cup) on cup and rap with a hammer. See Figure 23. Install snap ring and repeat on opposite cup.

3.Repeat Step 1 & Step 2 to install remaining cups in remaining yoke.

4.Move both yokes in all directions to check for free movement. If movement is restricted, rap on yokes sharply with a hammer to relieve any tension. Repeat until both yokes move in all directions without restriction.

Figure 23

30 Dealer Service

(Rev. 4/4/2011)

MAN0224 (Rev. 7/29/2005)

Page 30
Image 30
Woods Equipment RCC42 manual Dealer Service, U-JointAssembly