SECTION 3
INSTALLATION AND INITIAL TURN-ON
The following wires for connecting the
•
•System electrical ground to the isolation transformer chassis ground.
•Isolation transformer grid side terminals to line circuit breaker (or the AC disconnect switch if present).
•PV frame ground to
•
•PV+ to the inverter enclosure terminal block TBDC+.
•PV- to the inverter enclosure terminal block
•PV neutral if connecting a bipolar PV array.
Install all wires listed above. Refer to the following wiring diagram and the system schematics in Section 7 for more detailed terminal locations.
DOCUMENT: 151315PV-30208 Photovoltaic Inverter3-5
Operation and Maintenance Manual
Copyright 2003, Xantrex Technology Inc.