SECTION 4 OPERATION

System Fault

System Sleep Test

System Stop

System Shutdown

EXAMPLE OF NORMAL SYSTEM OPERATION

Upon initial application of AC voltage, the LCD located on upper enclosure will display ‘Shutdown’ for approximately 15 seconds. Once the system has finished initializing, the PV-30208 will remain in standby until adequate PV voltage is available. 5 minutes after the PV start voltage has been reached, the PV-30208 will synchronize to the utility grid and begin peak power tracking the PV array. The time delay protects the inverter from excessive on/off cycling.

The PV-30208 will continue to process power until the AC output power approaches the operating losses of the inverter for a period of 5 minutes. The time delay protects the inverter from excessive on/ off cycling.

DOCUMENT: 151315

PV-30208 Photovoltaic Inverter

4-6

 

Operation and Maintenance Manual

 

Copyright 2003, Xantrex Technology

Page 21
Image 21
Xantrex Technology PV-30208 Example of Normal System Operation, System Fault System Sleep Test System Stop System Shutdown