York H*RC018 THRU 060, H*RC036S Typical Installation, TYPICAL FIELD WIRING - 1 Phase Application

Models: H*RC018 THRU 060 H*RC036S

1 24
Download 24 pages 41.1 Kb
Page 13
Image 13
TYPICAL INSTALLATION

036-21137-004 Rev. C (0505)

TYPICAL INSTALLATION

 

MINIMUM 18” SERVICE ACCESS

THERMOSTAT

TO FURNACE OR

60” OVERHEAD

CLEARANCE ON ONE SIDE

 

 

AIR HANDLER

CLEARANCE

WEATHERPROOF

 

 

TERMINAL BLOCK

 

DISCONNECT

 

 

 

 

 

SWITCH

 

NEC CLASS 1 WIRING

 

 

 

NEC CLASS 2 WIRING

10” CLEARANCE

 

 

TO INDOOR COIL

COIL AREA

 

 

NOTE: ALL OUTDOOR WIRING MUST BE WEATHERPROOF.

SEAL OPENING(S) WITH

PERMAGUM OR EQUIVALENT

CONTROL ACCESS PANEL

TYPICAL FIELD WIRING - 1 Phase Application

ALL FIELD WIRING TO BE IN ACCORDANCE WITH ELECTRIC CODE (NEC) AND/OR LOCAL CODES

POWER WIRING

208/230-1-60

POWER WIRING

24 VOLT CONTROL WIRING

 

CONTROL WIRING

MINIMUM 18 GA. WIRE

 

 

 

 

FACTORY WIRING

(NEC CLASS 2)

 

 

 

 

 

 

FURNACE OR AIR HANDLER TERMINAL BLOCK

CONTACTOR

TERMINALS

GND.

LUGCOIL

CONDENSING UNIT

C Y R G W

* TERMINAL W IS ONLY REQUIRED ON SYSTEMS WITH HEAT.

*

Y R G W

ROOM THERMOSTAT

ALL OUTDOOR WIRING MUST BE WEATHERPROOF. USE COPPER CONDUCTORS ONLY.

TYPICAL FIELD WIRING - 3 Phase Application

ALL FIELD WIRING TO BE IN ACCORDANCE WITH ELECTRIC CODE (NEC) AND/OR LOCAL CODES

GND.

LUG

POWER WIRING

208/230-3-60

460-3-60

CONTACTOR TERMINALS

COIL

24 VOLT CONTROL WIRING MINIMUM 18 GA. WIRE (NEC CLASS 2)

*TERMINAL W IS ONLY REQUIRED ON SYSTEMS WITH HEAT.

POWER WIRING

CONTROL WIRING

FACTORY WIRING

FURNACE OR AIR HANDLER TERMINAL BLOCK

C Y R G W

YR G W *

CONDENSING UNIT

ROOM THERMOSTAT

ALL OUTDOOR WIRING MUST BE WEATHERPROOF. USE COPPER CONDUCTORS ONLY.

Unitary Products Group

13

Page 13
Image 13
York H*RC018 THRU 060, H*RC036S Typical Installation, TYPICAL FIELD WIRING - 1 Phase Application, 036-21137-004Rev. C