York YCAL0041, YCAL0065 manual PART 3 - EXECUTION 3.01INSTALLATION

Models: YCAL0065 YCAL0041

1 80
Download 80 pages 43.99 Kb
Page 78
Image 78
PART 3 - EXECUTION

water sensors, and liquid line components (solenoid valves, filter driers, sight glasses, and TXVs), as discrete elements of a complete factory system. Contractor shall be field erect system and provide interconnecting refrigerant piping and wiring in accordance with Manufacturer recommendations, and project plans and schedules. Where not oth- erwise specified, Contractor provided system piping shall be in accordance with applicable sections of ASHRAE Handbook.

O.Hot Gas By-Pass: Permits continuous, stable op- eration at capacities below the minimum step of unloading to as low as 5% capacity (depending on both the unit & operating conditions) by introducing an artificial load on the cooler. Hot gas by-pass is installed on only one refrigerant circuit (System #1).

P.Microprocessor Membrane Keypad Graphics on in lieu of Standard English:

1.French language.

2.German language.

3.Spanish language.

4.Italian language.

Q.Thermal Storage: Leaving chilled liquid setpoint range for charge cycle from 25°F to 20°F minimum, with automatic reset of the leaving brine temperature up to 40°F above the setpoint. (Works with Option T)

R.Low Temperature Process Brine: Leaving chilled liquid setpoint range 20°F to 30°F.

S.Chicago Code Relief Valves to meet Chicago Code requirements.

T.Building Automation System (EMS) Reset Interface: Chiller to accept 4 to 20mA, 0 to 10 VDC, or discrete contact closure input to reset the leaving chilled liquid temperature.

U.Remote Control Panel (Field-mounted): Auxiliary panel for remote user interface for functions nor- mally made at the unit control center. Available on YCAL0014-0080 models.

V.OptiView Remote Control Panel (Field-mounted): Graphical interface panel to remotely control and monitor up to 8 different units.

W.Multi-Unit Sequencing Panel (Field-mounted): Separate Sequencing control center is provided to permit control of up to eight chillers in parallel based

on mixed liquid temperature.

X.Sound Reduction (Factory-mounted):

1.Ultra quiet, low speed, reduced noise fans

2.Compressor Acoustic Sound Blankets

Y.Vibration Isolation (Field-mounted):

1.Neoprene Pad Isolators.

2.1 Inch Deflection Spring Isolators: Level ad- justable, spring and cage type isolators for mounting under the unit base rails.

3.2 Inch Deflection Seismic Isolators: Level ad- justable, restrained mounts in rugged welded steel housing with vertical and horizontal limit stops. Housings shall be designed to withstand a minimum 1.0g accelerated force in all direc- tions to 2 inches.

PART 3 - EXECUTION

3.01INSTALLATION

A.General: Rig and Install in full accordance with Manufacturers requirements, Project drawings, and Contract documents.

B.Location: Locate chiller as indicated on drawings, including cleaning and service maintenance clear- ance per Manufacturer instructions. Adjust and level chiller on support structure. If equipment provided exceeds height of scheduled chiller, installing con- tractor is responsible for additional costs associated with extending the height of parapet or screening walls/enclosures

C.Components: Installing Contractor shall provide and install all auxiliary devices and accessories for fully operational chiller.

D.Electrical: Coordinate electrical requirements and connections for all power feeds with Electrical Con- tractor (Division 16).

E.Controls: Coordinate all control requirements and connections with Controls Contractor.

F.Finish: Installing Contractor shall paint damaged and abraded factory finish with touch-up paint matching factory finish.

78